Metals - Latest Blog

Pure Cold Rolled Steel Coil Used for Industry

Pure Cold Rolled Steel Coil Used for Industry

 

1.Structure of Cold Rolled Steel Coil Description

 

Cold rolling means that hot rolled steel coil is rolled below recrystallization temperature after pickling, and its finished product is full hard coil. After annealing process for full hard coil, the finished product is cold rolled production. The thin gauge cold rolled steel sheet and strip steel have advantages of low surface roughness, high dimension accuracy and good mechanical properties etc, and which have been widely used in auto manufacturing, home appliance, architecture, aviation, precision instrument, hardware and enameling industry etc.


2.Main Features of the Cold Rolled Steel Coil

 

•High Purity

•Easy control and operation 
•High strength

•Fast melting

•Competitive price

•Best Service

 

3. Cold Rolled Steel Coil Images

 


4. Cold Rolled Steel Coil Specification

 

COLD ROLLED STEEL COIL

Thicknenss

0.10mm-4.00mm

Width       

600mm-2000mm

Sheets   length 

1200-6000mm

Coil   inner diameter 

508-610mm

Surface   treatement

matt   finish/bright finish,oiling/dry, bright anneal/black anneal

Coil   weight    

3-5t

 

5.FAQ of Cold Rolled Steel Coil

 

We have organized several common questions for our clientsmay help you sincerely

 

How about your company

A world class manufacturer & supplier of castings forging in carbon steel and alloy steelis one of the large-scale professional investment casting production bases in China,consisting of both casting foundry forging and machining factory. Annually more than 8000 tons Precision casting and forging parts are exported to markets in Europe,America and Japan. OEM casting and forging service available according to customer’s requirements.

 

How to guarantee the quality of the products

We have established the international advanced quality management systemevery link from raw material to final product we have strict quality testWe resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

 

How long can we receive the product after purchase?

In the purchase of product within three working days, We will arrange the factory delivery as soon as possible. The pecific time of receiving is related to the state and position of customers.Commonly 7 to 10 working days can be served.